Placing System In Operation
After component replacement and/or system servicing has been completed and all connections have been made, proceed as follows:
- Evacuate the system using a vacuum pump.
- Charge the system with new R-12 according to each individual vehicle manufacturer's procedure as outlined in this Manual. Also see REFRIGERANT CAPACITY in this Section .
- Leak test the system, with particular attention to all new connections and components.
- Make a performance test of the system.NOTE: Each of the above procedures is detailed in the GENERAL SERVICE Section of this Manual Also-refer to individual articles within this Supplement for further description of each vehicle's system.