Grind Complete
Includes: Remove carbon, check surfaces for warpage, reface or replace Valves, resurface Valve Seats and clean Valve Guides. Adjust Valves (where applicable).| Applies To | Note | Standard Hours | Warranty Hours | Skill Level |
|---|---|---|---|---|
| Gas,V8,5.8L Eng, Dual Air Pump | 16.5 | A | ||
| Gas,V8,5.8L Eng, Single Air Pump | 13.9 | A | ||
| Combination Procedure: ROCKER ARM STUD: Remove & Replace: | ||||
| Each | 0.2 | B | ||
| Combination Procedure: VALVE SPRING ASSEMBLED HEIGHT: Correct: | ||||
| Per 3 Springs | 0.2 | A | ||