Test TC: Step 16: Notes
16) Checking Circuit(s) For Shorts To Power With key off, ensure breakout box is installed and ECA is disconnected. Set DVOM on 200-k/ohm scale.
16) Checking Circuit(s) For Shorts To Power With key off, ensure breakout box is installed and ECA is disconnected. Set DVOM on 200-k/ohm scale.