Pinpoint Test D5: Short To VAPS Control Module
Turn ignition on. Put transmission in Park. Disconnect VAPS control module connector and instrument panel connector. Set VOM on 200-k/ohm scale. Measure resistance between Green/Red wire in VAPS control module connector and ground. If resistance is less than 10 k/ohms, service Green/Red wire between instrument panel and module for shorts. If resistance is NOT less than specification, proceed to PINPOINT TEST Q1 -PINPOINT TEST Q7 .