Fa-2 Solenoid Signal Check
Disconnect hydraulic control unit. Set voltmeter to 20V scale. Measure voltage between hydraulic motor relay Black/Red wire and ground. With key off, voltage should be zero volts. With key on, voltage should be greater than 10 volts. If voltage readings are correct, go to FA-3 SOLENOID CHECK AT ABS CONTROL UNIT . If voltage readings are not correct, go to FA-5 RELAY OPERATION .