Main Control Valve Body: Assembly
CAUTION:
Before beginning assembly, carry out and inspect the following:
When building up subassemblies and assembling the transmission, ALWAYS use new gaskets and seals.
All fasteners must be tightened to the torque specification indicated. In addition to appearing in the section, the necessary torque measurements can be found in the GENERAL SPECIFICATIONS .
When building up subassemblies, each component part should be lubricated with clean transmission fluid. It is also good practice to lubricate the subassemblies as they are installed in the case.
Needle bearings, thrust washers and seals should be lightly coated with clean automatic transmission fluid during subassembly buildup or transmission assembly.
Many components and surfaces in the transmission are precision machined. Careful handling during disassembly, cleaning, inspection and assembly can prevent unnecessary damage to machined surfaces.
When building up subassemblies and assembling the transmission, ALWAYS use new gaskets and seals.
All fasteners must be tightened to the torque specification indicated. In addition to appearing in the section, the necessary torque measurements can be found in the GENERAL SPECIFICATIONS .
When building up subassemblies, each component part should be lubricated with clean transmission fluid. It is also good practice to lubricate the subassemblies as they are installed in the case.
Needle bearings, thrust washers and seals should be lightly coated with clean automatic transmission fluid during subassembly buildup or transmission assembly.
Many components and surfaces in the transmission are precision machined. Careful handling during disassembly, cleaning, inspection and assembly can prevent unnecessary damage to machined surfaces.
NOTE:
Inspect the shift solenoid O-rings and TCC solenoid O-rings for damage.
- Install the valve body cover plate.
- Position the valve body cover plate gasket and cover plate.
- Loosely install the 2 guide pin bolts.
- Loosely install the remaining bolts.
- Tighten all the bolts in the sequence shown in Fig 2.
- Tighten to 10 N.m (89 lb-in).
- Install the 8 coasting booster valve shuttle balls.
- Install the converter drain back valve and solenoid pressure supply screen.
- Install the separator plate and gaskets.
- Install the 2 reinforcement plate and bolts.
- Tighten to 10 N.m (89 lb-in).
- Install the shift solenoid.
- Position the TCC solenoid.
- Position the shift solenoid.
- Install the bolt.
- Tighten to 10 N.m (89 lb-in).