LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Ford >> 2007 >> Expedition 4WD >> Repair and Diagnosis >> Engine Mechanical >> Mechanical >> Engine >> Disassembly And Assembly Of Subassemblies >> Intake Manifold Assembly >> Assembly
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Intake Manifold Assembly: Assembly

  1. Install the engine noise shield insulator onto the intake manifold.
  2. NOTE: Lubricate the new O-ring seal with clean engine oil prior to installation.
  3. Using a new O-ring seal, install the PCV heater element and the 2 bolts.
    • Tighten to 6 Nm (53 lb-in).
  4. Position the CMCV and install the stud bolt and the 2 bolts.
    • Tighten to 10 Nm (89 lb-in).
  5. Install the CMCV rod locking clips.
  6. NOTE: Lubricate the new O-ring seal with clean engine oil prior to installation.
  7. Install new O-ring seals on each of the fuel injectors.
  8. Assemble the fuel injectors onto the fuel rail and install the locking clips.
  9. Install the fuel rail and fuel injector assembly onto the intake manifold.
  10. Install the 4 fuel rail bolts.
    • Tighten to 10 Nm (89 lb-in).
  11. NOTE: Lubricate the TB-to-intake manifold gasket with clean engine coolant prior to installation.
  12. Install the TB, the vibration damper and tighten the bolts in 2 stages.
    • Stage 1: Tighten to 9 Nm (80 lb-in).
    • Stage 2: Tighten an additional 90 degrees.