LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Ford >> 2007 >> Focus ST >> Repair and Diagnosis >> Transmission >> Manual Trans >> Manual Transmission >> Disassembly And Assembly Of Subassemblies >> Output Shaft >> Assembly
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Output Shaft: Assembly

    NOTE: Do not lubricate new roller bearings.
  1. Lubricate all transmission components with transmission fluid during reassembly.
  2. NOTE: Handle the inner synchronizer ring and synchronizer cone very carefully.
  3. Install the following:
    1. First gear needle bearing
    2. First gear
    3. Inner synchronizer ring
    4. Synchronizer cone
    5. Outer synchronizer ring
  4. Fig 1: Identifying Inner And Outer Synchronizer Ring And Cone
    GF0040164Courtesy of FORD MOTOR CO.
    NOTE: Observe the markings on the selector ring.
    NOTE: Place a rubber band around the synchronizer body. Install the springs, the synchronizer bars and detent balls. Slide the synchronizer sleeve over the synchronizer body, while moving the rubber band downward.
  5. Assemble the synchronizer hub assembly.
    1. Install the compression springs.
    2. Install the keys and the detent balls in the gear synchronizer hub against the force of the spring.
    3. Align the selector ring with the hub and push it on.
  6. Fig 2: Identifying Compression Springs And Selector Ring
    GF0040165Courtesy of FORD MOTOR CO.
    NOTE: Install the synchronizer hub assembly with the larger collar facing toward 2nd gear.
  7. Install the 1st/2nd gear synchronizer hub assembly, then install a new snap ring.
  8. Fig 3: Locating 1st/2nd Gear Synchronizer Hub And Snap Ring
    GF0040162Courtesy of FORD MOTOR CO.
  9. Install the following:
    1. Second gear needle bearing
    2. Outer synchronizer ring
    3. Synchronizer cone
    4. Inner synchronizer ring
    5. Second gear
  10. Fig 4: Identifying 2nd Gear Needle Bearing And Cone
    GF0040166Courtesy of FORD MOTOR CO.
  11. Using a press and the special tool, install 3rd gear.
  12. Fig 5: Installing 3rd Gear
    GF0040167Courtesy of FORD MOTOR CO.
  13. Using a press and the special tool, install 4th gear. Install a new snap ring.
  14. Fig 6: Installing 4th Gear And Snap Ring
    GF0040168Courtesy of FORD MOTOR CO.
  15. Install the 5th gear needle bearing, 5th gear and the synchronizer ring.
  16. Fig 7: Installing 5th Gear Needle Bearing, 5th Gear And Synchronizer Ring
    GF0040158Courtesy of FORD MOTOR CO.
    NOTE: Install the synchronizer hub assembly with the small collar and the ring groove facing outward.
  17. Install the 5th/reverse gear synchronizer assembly and a new snap ring.
  18. Fig 8: Installing 5th/Reverse Gear Synchronizer Assembly
    GF0040169Courtesy of FORD MOTOR CO.
  19. Install the synchronizer ring, the reverse gear needle bearing and the reverse gear.
  20. Fig 9: Locating Synchronizer Ring, Reverse Gear Needle Bearing And Reverse Gear
    GF0040170Courtesy of FORD MOTOR CO.
  21. Using a suitable step plate and a press, press the bearing on by the inner race only. Install a new output shaft bearing.
  22. Fig 10: Installing Output Shaft Bearing
    GF0040171Courtesy of FORD MOTOR CO.
  23. Using a suitable step plate and a press, press the bearing on by the inner race only. Install a new output shaft bearing.
  24. Fig 11: Installing Output Shaft Bearing
    GF0040152Courtesy of FORD MOTOR CO.