Powertrain Control Module (PCM): Installation
- Install the PCM and the 2 bolts.
- Tighten to 8 Nm (71 lb-in).
- Connect the 3 PCM electrical connectors.
- Install the radiator sight shield and the 8 retainers.
- Restore the module configuration. Carry out the module configuration restore steps of the Programmable Module Installation (PMI) procedure. For additional information, refer to MODULE CONFIGURATION .