Transmission Assembly: Remove, Install, and Overhaul
TRANS ID - 6HP26, 6R60, 6R75, 6R80
Includes: Inspect and replace all necessary components, clean and check Converter, flush Converter and Oil Cooler Lines, adjust and road test.
| Applies To | Note | Standard Hours | Warranty Hours | Skill Level |
| 3.2L Eng | | 17.9 | | A |
| Additional Procedure: TRANSMISSION ASSEMBLY: Remove, Install, and Overhaul: |
| w/Three or Four Piece Driveshaft | | 0.2 | | A |
| Combination Procedure: FLYWHEEL: Remove & Replace: |
| | 0.3 | | C |
| Combination Procedure: OIL COOLER LINES: Remove & Replace: |
| | 0.3 | | C |