Generator - 2.0L GTDI: Installation
- 1.
Position the generator and hand-tighten the 3 bolts. Tighten in the sequence shown.- Tighten to 25 Nm (18 lb-ft).
- 4.
Install the upper Charge Air Cooler (CAC) pipe. For additional information, refer to Intake Air System Components - Exploded View in Intake Air Distribution and Filtering .
- 5.
- 6.
Connect the battery. For additional information, refer to Battery, Mounting and Cables .