Instrument Panel: Installation
- To install, reverse the removal procedure.
- Fill and bleed the cooling system. Refer to: ENGINE COOLING SYSTEM DRAINING, VACUUM FILLING AND BLEEDING - 1.5L EcoBoost (132kW/180PS) - I3 (Y1) . Refer to: Engine Cooling System Draining, Vacuum Filling and Bleeding - 2.0L EcoBoost (177kW/240PS) - MI4. Refer to: Engine Cooling System Draining, Vacuum Filling and Bleeding - 2.5L Duratec - Hybrid (121kW/164PS) (BG). Refer to: Cooling System Filling and Bleeding - Hybrid Electric Vehicle (HEV)