Engine Assembly: Remove, Install, and Overhaul
WARNING: This page is about the F-150 Lariat, 4D Pickup Crew Cab, 2.7L Eng VIN P, 4WD, which is a different variant/trim than selected.
Includes: Replace Rings, Main and Rod Bearings, Camshaft(s), Crankshaft and Timing Components. Remove Cylinder ridge, burnish Cylinders, grind Valves and clean and test or replace Lifters.
Includes (where applicable): Adjust Valves. DOES NOT include Pin fit or rebore and align Rods. See machine operations.| Applies To | Note | Standard Hours | Warranty Hours | Skill Level |
|---|---|---|---|---|
| 2.7L Eng,4WD, w/Body Off | 43.4 | A | ||
| 2.7L Eng,4WD, w/Body On | 45.1 | A |