Throttle Body ASSY: Replacement
WARNING: This page is about a different car, the 2005 Toyota Sienna. However, it is still accessible from the selected car via links, so may be relevant.
- DRAIN ENGINE COOLANT (See REPLACEMENT )
- REMOVE V-BANK COVER SUB-ASSY
- Using a socket hexagon wrench 5, remove the 3 nuts.
- Remove the V-bank cover.
- REMOVE AIR CLEANER CAP SUB-ASSY
- Disconnect the mass air flow meter connector.
- Disconnect the 3 vacuum hoses.
- Remove the fuel vapor feed hose from the 2 hose clamps.
- Disconnect the ventilation hose.
- Loosen the 2 air cleaner cap bolts.
- Loosen the hose clamp bolt and remove the air cleaner cap together with the air cleaner hose No. 1.
- Remove the air cleaner filter element.
- REMOVE THROTTLE BODY ASSY
- Disconnect the throttle motor connector.
- Disconnect the water by-pass hose No. 2.
- Disconnect the water by-pass hose No. 3.
- Remove the 2 bolts, the 2 nuts and the throttle body.
- Remove the gasket from the intake air connector.
- INSTALL THROTTLE BODY ASSY
- Install a new gasket to the intake air connector.
- Install the throttle body with the 2 bolts and the 2 nuts.
Torque: 11 N.m (112 kgf.cm, 8 ft.lbf)
- Connect the water by-pass hose No. 3.
- Connect the water by-pass hose No. 2.
- Connect the throttle motor connector.
- INSTALL AIR CLEANER CAP SUB-ASSY
Torque: 5.0 N.m (51 kgf.cm, 44 in.lbf)
- ADD ENGINE COOLANT (See REPLACEMENT )
- CHECK FOR ENGINE COOLANT LEAKS (See ON-VEHICLE INSPECTION )
- INSTALL V-BANK COVER SUB-ASSY
- Fit the 2 retainers and install the V-bank cover.
- Using a socket hexagon wrench 5, tighten the 3 nuts.
Torque: 7.9 N.m (81 kgf.cm, 70 in.lbf)