Transfer Valve Body Assembly: Installation
- INSTALL TRANSFER CONTROL SOLENOID (See 4 )
- INSTALL TRANSFER VALVE BODY ASSEMBLY
- Connect the transfer wire connector to the transfer control solenoid.
- Install the transfer upper valve body with the 4 bolts.
Torque: 9.8 N*m (100 kgf*cm, 87 in.*lbf)
- INSTALL TRANSFER OIL PAN (See 2 )
- INSTALL TRANSFER DYNAMIC DAMPER (See 3 )
- INSTALL ENGINE REAR MOUNTING MEMBER (See 4 )
- INSTALL FRONT EXHAUST PIPE ASSEMBLY
(INSTALLATION )
- ADD AUTOMATIC TRANSMISSION FLUID ( AUTOMATIC TRANSMISSION FLUID )
- CHECK FOR EXHAUST GAS LEAKS