Height Control Valve: Installation
- INSTALL HEIGHT CONTROL VALVE SUB-ASSY NO.1
- Install the height control valve sub-assembly No.1 with the 2 nuts.
Torque: 5.4 N*m (55 kgf*cm, 48 in.*lbf)
- Coat 2 new O-rings with MP grease No.2 and install them on each height control tube.
- Connect the 3 height control tubes onto the height control valve sub-assembly No.1.
HINT:
For the removal procedure of the (type 3) tube, refer to PRECAUTION .
- Connect the connector.
- Install the height control valve sub-assembly No.1 with the 2 nuts.
- INSPECT AIR LEAK
- INSTALL FRONT BUMPER COVER
- INSTALL FRONT FENDER SPLASH SHIELD SUBASSY LH
- INSTALL FRONT FENDER SPLASH SHIELD SUBASSY RH
- INSTALL ENGINE UNDER COVER NO.1
- INSTALL HEIGHT CONTROL VALVE SUB-ASSEMBLY NO. 2
- Install the height control valve sub-assembly No.2 with the 2 nuts.
Torque: 5.4 N*m (55 kgf*cm, 48 in.*lbf)
- Coat the O-ring with MP grease.
- Install the O-ring onto the height control tube.
- Connect the height control tube.
HINT:
For the removal procedure of the (type 3) tube, refer to PRECAUTION
- Install 6 new O-ring and 3 new plates to each installed part of the height control valve No.2 tube.
HINT:
When the height control valve No.2 is replaced with a new one, it does not require a new O-ring.
- Install the 3 height control tubes.
HINT:
For the removal procedure of the (type 2) tube, refer to PRECAUTION
- Connect the connector.
- Install the height control valve sub-assembly No.2 with the 2 nuts.
- INSPECT AIR LEAK