Camshaft Timing Oil Control Valve Assembly: Installation
- INSTALL CAMSHAFT TIMING OIL CONTROL VALVE (for Bank 2 Exhaust Side)
- Apply a light coat of engine oil to a new O-ring and install it to the camshaft timing oil control valve.
- Install the camshaft timing oil control valve with the bolt.
Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf)
NOTE: Make sure that the O-ring is not cracked or jammed when installing the oil control valve. - Connect the camshaft timing oil control valve connector.
- INSTALL CAMSHAFT TIMING OIL CONTROL VALVE (for Bank 2 Intake Side)
- Apply a light coat of engine oil to a new O-ring and install it to the camshaft timing oil control valve.
- Install the camshaft timing oil control valve with the bolt.
Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf)
NOTE: Make sure that the O-ring is not cracked or jammed when installing the oil control valve. - Connect the camshaft timing oil control valve connector.
- INSTALL CAMSHAFT TIMING OIL CONTROL VALVE (for Bank 1 Exhaust Side)
- Apply a light coat of engine oil to a new O-ring and install it to the camshaft timing oil control valve.
- Install the camshaft timing oil control valve with the bolt.
Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf)
NOTE: Make sure that the O-ring is not cracked or jammed when installing the oil control valve. - Connect the camshaft timing oil control valve connector.
- INSTALL CAMSHAFT TIMING OIL CONTROL VALVE (for Bank 1 Intake Side)
- Apply a light coat of engine oil to a new O-ring and install it to the camshaft timing oil control valve.
- Install the camshaft timing oil control valve with the bolt.
Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf)
NOTE: Make sure that the O-ring is not cracked or jammed when installing the oil control valve. - Connect the camshaft timing oil control valve connector.
- INSTALL INTAKE AIR SURGE TANK (See INSTALLATION )
- INSTALL NO. 1 AIR CLEANER INLET (See INSTALLATION )
- INSTALL AIR CLEANER CASE SUB-ASSEMBLY (See INSTALLATION )
- INSTALL AIR CLEANER CAP SUB-ASSEMBLY (See INSTALLATION )
- INSTALL AIR CLEANER INLET ASSEMBLY (See INSTALLATION )
- INSTALL FRONT SUSPENSION UPPER CENTER BRACE (See INSTALLATION )
- ADD ENGINE COOLANT (See Drain or Add coolant under ON-VEHICLE INSPECTION )
- CHECK FOR ENGINE COOLANT LEAKS (See ON-VEHICLE INSPECTION )
- INSTALL V-BANK COVER SUB-ASSEMBLY (See INSTALLATION )
- INSTALL ENGINE ROOM SIDE COVER LH (See INSTALLATION )
- INSTALL ENGINE ROOM SIDE COVER RH (See INSTALLATION )
- INSTALL COOL AIR INTAKE DUCT SEAL (See INSTALLATION )
- INSTALL ENGINE UNDER COVER RH
- INSTALL ENGINE UNDER COVER LH