Steering Pad Switch: Installation
WARNING: This page is about a different car, the 2007 Lexus ES 350. However, it is still accessible from the selected car via links, so may be relevant.
- INSTALL STEERING PAD SWITCH ASSEMBLY
- Engage the 4 claws.
- Install the steering pad switch assembly with the 2 screws.
Torque: 2.4 N*m (25 kgf*cm, 21 in.*lbf)
- Connect the connector to the spiral cable.
- INSTALL STEERING PAD (See INSTALLATION )
- INSTALL LOWER NO. 3 STEERING WHEEL COVER (See INSTALLATION )
- INSTALL LOWER NO. 2 STEERING WHEEL COVER (See INSTALLATION )
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
- PERFORM INITIALIZATION NOTE: Some systems need initialization after reconnecting the cable to the negative battery terminal (See INITIALIZATION ).
- INSPECT SRS WARNING LIGHT
(See DIAGNOSIS SYSTEM )