Integration Relay: Installation
- INSTALL INTEGRATION RELAY
- Connect the 3 connectors.
- Attach the integration relay to the engine room No. 2 relay block.
- Install the engine engine room No. 1 relay block cover.
- INSTALL ENGINE ROOM SIDE COVER LH (See INSTALLATION )
- INSTALL COOL AIR INTAKE DUCT SEAL (See INSTALLATION )
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
- PERFORM INITIALIZATION
- Perform initialization (see INITIALIZATION
).NOTE: Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.
- Perform initialization (see INITIALIZATION
).