Park/Neutral Position Switch: Installation
- INSTALL PARK/NEUTRAL POSITION SWITCH ASSEMBLY
- Install the switch to the manual valve shaft.
- Temporarily install the bolt.
- Install a new lock washer with the nut.
Torque: 6.9 N*m (70 kgf*cm, 61 in.*lbf)
- Temporarily install the control shaft lever with shifting rod.
- Turn the control shaft lever counterclockwise until it stops, and then turn it clockwise 2 notches to set it to the N position.
- Remove the control shaft lever with shifting rod.
- Align the groove with the neutral basic line.
- Hold the switch in this position and tighten the bolt.
Torque: 13 N*m (130 kgf*cm, 9 ft.*lbf)
- Using a screwdriver, bend the tabs of the lock washer.
HINT:
Bend at least 2 washer tabs.
- Install the transmission control shaft lever with the spring washer and nut.
Torque: 16 N*m (160 kgf*cm, 12 ft.*lbf)
- Connect the switch connector.
- INSTALL REAR ENGINE MOUNTING MEMBER
- Install the rear engine mounting member with the 4 bolts.
Torque: 26 N*m (265 kgf*cm, 19 ft.*lbf)
- Install the rear engine mounting member with the 4 bolts.
- CONNECT FLOOR SHIFT GEAR SHIFTING ROD SUB-ASSEMBLY
- Temporarily connect the shifting rod to the connecting rod swivel with the nut.
HINT:
The nut will be tightened to the specified torque during the shift lever position adjustment procedure.
- Temporarily connect the shifting rod to the connecting rod swivel with the nut.
- ADJUST SHIFT LEVER POSITION
- Adjust the shift lever position (see ADJUSTMENT ).
- INSTALL REAR PROPELLER SHAFT ASSEMBLY (See INSTALLATION )
- FULLY TIGHTEN NO. 1 CENTER SUPPORT BEARING ASSEMBLY (See INSTALLATION )
- INSPECT AND ADJUST NO. 2 AND NO. 3 JOINT ANGLE (See INSTALLATION )
- INSTALL AIR GUIDE PLATE OUTSIDE RH (See INSTALLATION )
- INSTALL FRONT FLOOR NO. 1 HEAT INSULATOR (See INSTALLATION )
- INSTALL FRONT EXHAUST PIPE ASSEMBLY (See REMOVAL )
- CONNECT HEATED OXYGEN SENSOR (for Bank 2 Sensor 2) (See INSTALLATION )
- CONNECT HEATED OXYGEN SENSOR (for Bank 1 Sensor 2) (See INSTALLATION )
- INSTALL FRONT FLOOR COVER CENTER LH (See INSTALLATION )
- INSTALL FRONT FLOOR COVER CENTER RH (See INSTALLATION )
- INSTALL FRONT CENTER FLOOR BRACE (See INSTALLATION )
- INSTALL REAR NO. 1 FLOOR PANEL BRACE (See INSTALLATION )
- INSTALL NO. 2 ENGINE UNDER COVER
- INSPECT PARK/NEUTRAL POSITION SWITCH ASSEMBLY
- Inspect the switch (see ON-VEHICLE INSPECTION ).
- INSPECT FOR EXHAUST GAS LEAK