Purge Valve: Installation
- INSTALL PURGE VSV
- Install the purge VSV with the bolt.
Torque: 21 N*m (215 kgf*cm, 15 ft.*lbf)
- Connect the 2 purge line hoses to the purge VSV.
- Connect the purge VSV connector.
- Install the purge VSV with the bolt.
- CONNECT ENGINE WIRE (See INSTALLATION )
- INSTALL AIR CLEANER CAP LH
- Install the air cleaner cap LH.
- INSTALL AIR CLEANER CAP RH
- Install the air cleaner cap RH.
- INSTALL INTAKE AIR CONNECTOR PIPE (See INSTALLATION )
- INSTALL NO. 1 AIR CLEANER INLET (See INSTALLATION )
- INSTALL V-BANK COVER SUB-ASSEMBLY (See INSTALLATION )
- INSTALL ENGINE ROOM SIDE COVER LH (See INSTALLATION )
- INSTALL ENGINE ROOM SIDE COVER RH (See INSTALLATION )
- INSTALL AIR CLEANER INLET COVER (See INSTALLATION )
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
- INSTALL COWL TOP VENTILATOR LOUVER RH (See INSTALLATION )
- PERFORM INITIALIZATION
- Perform initialization (see
INITIALIZATION
).NOTE: Certain systems need to be initialized after reconnecting the cable to the negative (-) battery terminal.
- Perform initialization (see
INITIALIZATION
).