Inspection Procedure
- INSPECT IF SKID CONTROL ECU CONNECTOR IS SECURELY CONNECTED
- Check the skid control ECU connector connection.
OK: The connector is securely connected.
NG: CONNECT CONNECTOR TO ECU CORRECTLY
OK: Go to next step
- INSPECT BATTERY
- Check the battery voltage.
Standard Voltage:
11 to 14 V
NG: GO TO CHARGING SYSTEM (ON-VEHICLE INSPECTION) (See ON-VEHICLE INSPECTION )
OK: Go to next step
- CHECK CAN COMMUNICATION LINE
- Turn the engine switch off.
- Connect the Techstream to the DLC3.
- Turn the engine switch on (IG) and the Techstream on.
- Select "CAN Bus Check" from the System Selection Menu screen, and follow the prompts on the screen to inspect the CAN Bus.
OK: "CAN Bus Check" indicates no malfunctions in CAN communication.
NG: GO TO CAN COMMUNICATION SYSTEM (HOW TO PROCEED WITH TROUBLESHOOTING) (See HOW TO PROCEED WITH TROUBLESHOOTING )
OK: Go to next step
- CHECK DTC (for CAN Communication System)
- Turn the engine switch off.
- Connect the Techstream to the DLC3.
- Turn the engine switch on (IG) and the Techstream on.
- Check for DTCs (See HOW TO PROCEED WITH TROUBLESHOOTING ).
Result
RESULT REFERENCEResult Proceed to CAN system DTC is not output. A CAN system DTC is output. B B: GO TO CAN COMMUNICATION SYSTEM (DIAGNOSTIC TROUBLE CODE CHART) (See DIAGNOSTIC TROUBLE CODE CHART )
A: Go to next step
- CHECK OPERATION OF ABS WARNING LIGHT (ACTIVE TEST)
- Turn the engine switch off.
- Connect the Techstream to the DLC3.
- Turn the engine switch on (IG) and the Techstream on.
- Enter the following menus: Body Electrical / Combination Meter / Active Test.
- Check the condition of the ABS warning light by operating the Techstream.
Combination Meter
ACTIVE TEST DETAILTester Display Test Part Control Range Diagnostic Note Indicat Lamp ABS ABS Warning Light Warning light ON/OFF - OK: The warning light turns on when operating the Techstream.
NG: REPLACE COMBINATION METER ASSEMBLY (See REMOVAL )
OK: Go to next step
- INSPECT SKID CONTROL ECU (IG1 TERMINAL)
- Disconnect the A24 skid control ECU connector.
- Turn the engine switch on (IG).
- Measure the voltage according to the value(s) in the table below.
Standard Voltage
VOLTAGE SPECIFICATIONTester Connection Switch Condition Specified Condition A24-46 (IG1) - Body ground Engine switch on (IG) 11 to 14 V NG: REPAIR OR REPLACE HARNESS OR CONNECTOR
Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
OK: Go to next step
- INSPECT SKID CONTROL ECU (GND TERMINAL)
- Disconnect the A24 and A25 skid control ECU connectors.
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
RESISTANCE SPECIFICATIONTester Connection Condition Specified Condition A24-1 (GND1) - Body ground Always Below 1 Ω A24-32 (GND2) - Body ground Always Below 1 Ω A25-4 (GND3) - Body ground Always Below 1 Ω NG: REPAIR OR REPLACE HARNESS OR CONNECTOR
OK: REPLACE MASTER CYLINDER SOLENOID (See DISASSEMBLY )