Charging System: Generator: Disassembly
- REMOVE GENERATOR PULLEY
SST 09820-63011 (09820-06010, 09820-06021)
HINT:
TOOL REFERENCE CHARTSST 1-A and B 09820-06010 SST 2 09820-06021 - Hold SST 1-A with a torque wrench, and tighten SST 1-B clockwise to the specified torque.
Torque: 39 N*m (398 kgf*cm, 29 ft.*lbf)
NOTE: Check that SST is secured on the rotor shaft. - Mount SST 2 in a vise.
- Insert SST 1-A and B into SST 2, and attach the pulley nut to SST 2.
- To loosen the pulley nut, turn SST 1-A in the direction shown in the illustration.NOTE: To prevent damage to the rotor shaft, do not loosen the pulley nut more than one-half turn.
- Remove the generator from SST 2.
- Turn SST 1-B, and remove SST 1-A and B.
- Remove the pulley nut and pulley.
- Hold SST 1-A with a torque wrench, and tighten SST 1-B clockwise to the specified torque.
- REMOVE GENERATOR REAR END COVER
- Place the generator on the pulley.
- Remove the 3 nuts and end cover.
- Remove the terminal insulator.
- REMOVE GENERATOR BRUSH HOLDER ASSEMBLY
- Remove the 2 screws and brush holder.
- REMOVE GENERATOR COIL ASSEMBLY
- Remove the 4 bolts.
- Using SST, remove the coil assembly.
SST 09950-40011 (09951-04020,09952-04010, 09953-04020, 09954-04010, 09955-04071, 09957-04010, 09958-04011)
- REMOVE GENERATOR ROTOR ASSEMBLY
- Remove the generator washer and generator rotor.
- REPLACE GENERATOR DRIVE END FRAME BEARING
- Remove the 4 screws and retainer plate.
- Using SST and a hammer, tap out the bearing.
SST 09950-60010 (09951-00250), 09950-70010 (09951-07100)
- Using SST and a press, press in a new bearing.
SST 09950-60010 (09951-00500), 09950-70010 (09951-07100)
- Install the retainer plate with the 4 screws.
Torque: 3.0 N*m (30 kgf*cm, 26 in.*lbf)