Fuel Injector: Installation
- INSTALL FUEL INJECTOR ASSEMBLY
- Apply a light coat of spindle oil or gasoline to new O-rings, and install them to each injector.
- Apply a light coat of spindle oil or gasoline where the fuel delivery pipe contacts the O-ring.
- Push the fuel injector while turning it to install the injector in the fuel delivery pipe.
- Position the fuel injector connector outward.NOTE:
- Be careful not to twist the O-ring.
- After installing the fuel injector, check that it turns smoothly. If not, reinstall it with a new O-ring.
- Install 6 new insulators to the intake manifold.
- Place the fuel delivery pipe and the 6 fuel injectors together to the intake manifold.NOTE: Be careful not to drop the fuel injectors when installing the fuel delivery pipe.
- Temporarily install the 5 bolts which are used to hold the fuel delivery pipe to the intake manifold.NOTE: After installing the fuel injector, check that it turns smoothly. If not, reinstall it with a new O-ring.
- Tighten the 5 bolts which are used to hold the fuel delivery pipe to the intake manifold.
Torque: 21 N*m (214 kgf*cm, 15 ft.*lbf)
- Connect the 6 fuel injector connectors.
- CONNECT FUEL TUBE SUB-ASSEMBLY
- Push in the tube connector to the pipe until the tube connector makes a "click" sound.NOTE:
- Before connecting the tube, make sure that it is not damaged. Make sure that there is no dirt present on the connecting surfaces.
- After connecting, check if the fuel tube connector and the pipe are securely connected by pulling on them.
- Install the No. 2 fuel pipe clamp.
- Push in the tube connector to the pipe until the tube connector makes a "click" sound.
- INSTALL INTAKE AIR SURGE TANK ASSEMBLY (See INSTALLATION )
- INSTALL AIR CLEANER CAP SUB-ASSEMBLY (See INSTALLATION )
- INSTALL COWL TOP PANEL OUTER SUB-ASSEMBLY (See INSTALLATION )
- INSTALL WINDSHIELD WIPER MOTOR AND LINK ASSEMBLY (See INSTALLATION )
- INSTALL COWL TOP VENTILATOR LOUVER SUB-ASSEMBLY
- INSTALL FRONT FENDER TO COWL SIDE SEAL LH
- INSTALL FRONT FENDER TO COWL SIDE SEAL RH
- INSTALL FRONT WIPER ARM AND BLADE ASSEMBLY LH (See INSTALLATION )
- INSTALL FRONT WIPER ARM AND BLADE ASSEMBLY RH (See INSTALLATION )
- ADD ENGINE COOLANT (See ON-VEHICLE INSPECTION )
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL (See INSTALLATION )
- CHECK FOR ENGINE COOLANT LEAKS (See ON-VEHICLE INSPECTION )
- CHECK FOR FUEL LEAKS (See ON-VEHICLE INSPECTION )
- INSTALL V-BANK COVER SUB-ASSEMBLY (See INSTALLATION )
- INSTALL ENGINE ROOM COVER SIDE (See INSTALLATION )
- PERFORM INITIALIZATION
- Perform initialization procedure (See INITIALIZATION
).
HINT:
Some systems need initialization after reconnecting the cable to the negative battery terminal.
- Perform initialization procedure (See INITIALIZATION
).