LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Lexus >> 2008 >> SC 430 >> Repair and Diagnosis >> Engine Mechanical >> Auxiliary Emission Control Systems >> Emission Control >> PCV Valve >> Installation
April 5, 2026: LEMON Manuals is launched! Read the announcement.

PCV Valve: Installation

  1. INTALL VENTILATION VALVE SUB-ASSEMBLY 
    1. Install the valve.
      1. Apply adhesive to 2 or 3 threads.

        Adhesive: 

        Toyota genuine adhesive 1324, three bond 1324 or equivalent 

        Fig 1: Applying Adhesive To Threads
        G05289241Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      2. Install the valve.

        Torque: 27 N*m (275 kgf*cm, 20 ft.*lbf) 

        Fig 2: Identifying Ventilation Valve
        G05289242Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002

        HINT:

        After applying the specified torque, rotate the valve clockwise with the port facing the direction shown in the illustration.

        Fig 3: Rotating Valve Clockwise
        G05289243Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    2. Install the ventilation valve cover.
    3. Connect the hose to the valve.
      Fig 4: Identifying Ventilation Hose
      G05289244Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  2. INSTALL INTAKE AIR CONNECTOR PIPE 
    1. Connect the air hose and ventilation hose.
    2. Install the bolt and intake air connector pipe with the bolt.

      Torque: 5.0 N*m (51 kgf*cm, 44 in.*lbf) 

    3. Tighten the 2 hose clamps.
  3. INSTALL NO. 1 AIR CLEANER INLET 
    1. Install the inlet with the bolt.

      Torque: 5.0 N*m (51 kgf*cm, 44 in.*lbf) 

  4. INSTALL V-BANK COVER 
    1. Install the cover the 2 nuts.

      Torque: 5.0 N*m (51 kgf*cm, 44 in.*lbf)