PCV Valve: Installation
- INTALL VENTILATION VALVE SUB-ASSEMBLY
- Install the valve.
- Apply adhesive to 2 or 3 threads.
Adhesive:
Toyota genuine adhesive 1324, three bond 1324 or equivalent
- Install the valve.
Torque: 27 N*m (275 kgf*cm, 20 ft.*lbf)
HINT:
After applying the specified torque, rotate the valve clockwise with the port facing the direction shown in the illustration.
- Apply adhesive to 2 or 3 threads.
- Install the ventilation valve cover.
- Connect the hose to the valve.
- Install the valve.
- INSTALL INTAKE AIR CONNECTOR PIPE
- Connect the air hose and ventilation hose.
- Install the bolt and intake air connector pipe with the bolt.
Torque: 5.0 N*m (51 kgf*cm, 44 in.*lbf)
- Tighten the 2 hose clamps.
- INSTALL NO. 1 AIR CLEANER INLET
- Install the inlet with the bolt.
Torque: 5.0 N*m (51 kgf*cm, 44 in.*lbf)
- Install the inlet with the bolt.
- INSTALL V-BANK COVER
- Install the cover the 2 nuts.
Torque: 5.0 N*m (51 kgf*cm, 44 in.*lbf)
- Install the cover the 2 nuts.