Integration Relay: Installation: Installation
- INSTALL INTEGRATION NO. 1 RELAY
- Connect the 3 connectors.
- Attach the integration relay to the engine room No. 2 relay block.
- Install the engine engine room No. 1 relay block cover.
- INSTALL ENGINE ROOM SIDE COVER LH . Refer to INSTALLATION - Step 70
- INSTALL COOL AIR INTAKE DUCT SEAL . Refer to INSTALLATION - Step 71
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL NOTE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected Refer to INITIALIZATION .