Inspection Procedure
- CHECK TCM (POWER SOURCE, BODY GROUND)
- Disconnect the A12 and E5 TCM connectors.
- Turn the engine switch on (IG).
- Measure the voltage according to the value(s) in the table below.
Standard Voltage
VOLTAGE SPECIFICATIONTester Connection Switch Condition Specified Condition A12-6 (+B) - E5-7 (E1) Engine switch on (IG) 11 to 14 V - Turn the engine switch off.
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
RESISTANCE REFERENCETester Connection Condition Specified Condition E5-7 (E1) - Body ground Always Below 1 Ω NG: CHECK HARNESS AND CONNECTOR (TCM EFI MAIN2 RELAY, BODY GROUND)
OK: GO TO ECM POWER SOURCE CIRCUIT (ENGINE CONTROL SYSTEM/SFI SYSTEM) (See ECM POWER SOURCE CIRCUIT )