Floor Shift Assembly: Installation
HINT:
A bolt without a torque specification is shown in the standard bolt chart (See SPECIFIED TORQUE FOR STANDARD BOLTS ).
- INSTALL TRANSMISSION FLOOR SHIFT ASSEMBLY
- Install the floor shift with the 4 bolts.
Torque: 8.3 N*m (85 kgf*cm, 74 in.*lbf)
- Attach the 6 wire harness clamps to the floor shift.
- Connect the 2 connectors.
- Install the floor shift with the 4 bolts.
- CONNECT FLOOR SHIFT GEAR SHIFTING ROD SUB-ASSEMBLY
- Temporarily connect the shifting rod to the connecting rod swivel with the nut.
HINT:
The nut is tightened to a torque specification during the shift lever position adjustment procedure.
- INSTALL NO. 1 CONSOLE BOX DUCT
- Install the duct with the 2 screws.
- INSTALL CONSOLE BOX ASSEMBLY
- Install the console box (See INSTALLATION ).
- ADJUST SHIFT LEVER POSITION
- Adjust the shift lever position (See ADJUSTMENT ).
- INSTALL FRONT FLOOR NO. 1 HEAT INSULATOR (See INSTALLATION )
- INSTALL FRONT EXHAUST PIPE ASSEMBLY
- Install the front exhaust pipe (See INSTALLATION ).
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL NOTE: When disconnecting the cable, some systems need to be initialized after the cable is reconnected (See INITIALIZATION ).
- INSTALL COWL TOP VENTILATOR LOUVER (See INSTALLATION )
- INSPECT SHIFT LEVER POSITION
- Inspect the shift lever position (See ON-VEHICLE INSPECTION ).