LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Lexus >> 2009 >> LS 460 RWD >> Repair and Diagnosis >> Engine Mechanical >> Auxiliary Emission Control Systems >> Canister >> Installation
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Auxiliary Emission Control Systems: Canister: Installation

  1. INSTALL CANISTER 
    1. Connect the purge line hose to the charcoal canister.
    2. Attach the 2 clamps.
      Fig 1: Locating Purge Line Hose Clamps
      G04943714Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    3. Install the canister with the 4 bolts and 2 plastic nuts.

      Torque: 21 N*m (214 kgf*cm, 15 ft.*lbf) 

      Fig 2: Locating Canister Bolts And Plastic Nuts
      G06196202Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    4. Connect the connector (leak detection pump).
    5. Connect the purge line hose to the canister.
      Fig 3: Locating Leak Detection Pump Connector
      G04943712Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    6. Connect the air inlet line tube (leak detection pump) and vent line tube to the pipes of the canister, as shown in A in the illustration. Then slide the retainers to lock the claws, as shown in B in the illustration.
      NOTE:
      • Check that there are no scratches or foreign matter around the connecting part of the fuel tube connector and pipe before connecting them.
      • After connecting the fuel tube connector, check that the fuel tube connector is securely connected by trying to pull the fuel tube connector and pipe apart.
        Fig 4: Connecting Air Inlet Line Tube And Vent Line Tube To Pipes Of Canister
        G04943724Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  2. INSTALL FLOOR NO. 1 UNDER COVER 
    1. Install the under cover with the 5 nuts and 5 clips.
    2. Install the 2 hole plugs.
    3. Fig 5: Locating Floor No. 1 Under Cover Nuts And Clips
      G04943709Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL 
    NOTE: When disconnecting the cable, some systems need to be initialized after the cable is reconnected (see INITIALIZATION ).
  4. INSTALL COWL TOP VENTILATOR LOUVER RH  (See INSTALLATION )