Auxiliary Emission Control Systems: Canister: Installation
- INSTALL CANISTER
- Connect the purge line hose to the charcoal canister.
- Attach the 2 clamps.
- Install the canister with the 4 bolts and 2 plastic nuts.
Torque: 21 N*m (214 kgf*cm, 15 ft.*lbf)
- Connect the connector (leak detection pump).
- Connect the purge line hose to the canister.
- Connect the air inlet line tube (leak detection pump) and vent line tube to the pipes of the canister, as shown in A in the illustration. Then slide the retainers to lock the claws, as shown in B in the illustration.NOTE:
- Check that there are no scratches or foreign matter around the connecting part of the fuel tube connector and pipe before connecting them.
- After connecting the fuel tube connector, check that the fuel tube connector is securely connected by trying to pull the fuel tube connector and pipe apart.
- INSTALL FLOOR NO. 1 UNDER COVER
- Install the under cover with the 5 nuts and 5 clips.
- Install the 2 hole plugs.
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL NOTE: When disconnecting the cable, some systems need to be initialized after the cable is reconnected (see INITIALIZATION ).
- INSTALL COWL TOP VENTILATOR LOUVER RH (See INSTALLATION )