LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Lexus >> 2011 >> IS 250 Base, AWD >> Repair and Diagnosis >> External Pages >> Different car >> Section 123 (Engine Control System (Service Information)) >> Engine Coolant Temperature Sensor >> Installation >> Installation
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Engine Coolant Temperature Sensor: Installation: Installation

WARNING: This page is about a different car, the 2011 Lexus IS 350. However, it is still accessible from the selected car via links, so may be relevant.
  1. INSTALL ENGINE COOLANT TEMPERATURE SENSOR 
    1. Install a new gasket to the engine coolant temperature sensor.
    2. Install the engine coolant temperature sensor.
      Fig 1: Identifying Engine Coolant Temperature Sensor & Connector
      GTY104618Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002

      Torque: 20 N.m (204 kgf cm, 15 ft. lbf) 

    3. Connect the engine coolant temperature sensor connector.
  2. INSTALL INTAKE MANIFOLD  . Refer to INSTALLATION - Step 12
  3. INSTALL INTAKE AIR SURGE TANK ASSEMBLY  . Refer to INSTALLATION - Step 3
  4. INSTALL THROTTLE BODY  See step  1
  5. INSTALL AIR CLEANER CAP WITH AIR CLEANER HOSE  See step  2
  6. CONNECT NO. 2 VENTILATION HOSE  See step  3
  7. ADD ENGINE COOLANT  . Refer to ON-VEHICLE INSPECTION - Step 5
  8. INSPECT FOR COOLANT LEAK  . Refer to ON-VEHICLE INSPECTION - Step 1
  9. INSPECT FOR FUEL LEAK  . Refer to ON-VEHICLE INSPECTION - Step 1
  10. INSTALL COWL TOP VENTILATOR LOUVER SUB-ASSEMBLY  . Refer to INSTALLATION - Step 3
  11. INSTALL WINDSHIELD WIPER ARM AND BLADE ASSEMBLY LH  . Refer to INSTALLATION - Step 4
  12. INSTALL WINDSHIELD WIPER ARM AND BLADE ASSEMBLY RH  . Refer to INSTALLATION - Step 5
  13. INSTALL FRONT WIPER ARM HEAD CAP  . Refer to INSTALLATION - Step 6
  14. INSTALL ROOF DRIP SIDE FINISH MOULDING LH 
  15. INSTALL ROOF DRIP SIDE FINISH MOULDING RH 
  16. INSTALL FRONT FENDER PROTECTOR UPPER LH  . Refer to INSTALLATION - Step 9
  17. INSTALL FRONT FENDER PROTECTOR UPPER RH  . Refer to INSTALLATION - Step 10
  18. INSTALL V-BANK COVER SUB-ASSEMBLY  . Refer to INSTALLATION - Step 114
  19. INSTALL ENGINE ROOM SIDE COVER LH  . Refer to INSTALLATION - Step 115
  20. INSTALL ENGINE ROOM SIDE COVER RH  . Refer to INSTALLATION - Step 116
  21. INSTALL COOL AIR INTAKE DUCT SEAL  . Refer to INSTALLATION - Step 117