LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Lexus >> 2011 >> LS 600hL >> Repair and Diagnosis >> Engine Performance >> Remove, Overhaul & Install >> Engine Control System (Service Information) >> Camshaft Oil Control Valve >> Installation >> Installation
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Camshaft Oil Control Valve: Installation: Installation

HINT: 

When viewed from the rear of the engine assembly, Bank 1 is on the left side and Bank 2 is on the right side.

  1. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Bank 1) 
    1. Apply a light coat of engine oil to a new O-ring, and install it to the oil control valve.
    2. Install the oil control valve with the bolt.
      Fig 1: Locating Oil Control Valve Connector (Bank 1)
      GTY147506Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002

      Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf) 

      NOTE:
      • Do not allow foreign matter to contact the oil seal face of the oil control valve (connecting surface with cylinder head cover).
      • Be careful that the O-ring is not cracked or moved out of place when installing the oil control valve.
    3. Connect the camshaft timing oil control valve connector.
  2. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Bank 2) 
    1. Apply a light coat of engine oil to a new O-ring, and install it to the oil control valve.
    2. Install the oil control valve with the bolt.
      Fig 2: Locating Oil Control Valve Connector (Bank 2)
      GTY147505Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002

      Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf) 

      NOTE:
      • Do not allow foreign matter to contact the oil seal face of the oil control valve (connecting surface with cylinder head cover).
      • Be careful that the O-ring is not cracked or moved out of place when installing the oil control valve.
    3. Connect the camshaft timing oil control valve connector.
  3. INSTALL NO. 1 AIR CLEANER INLET  . Refer to INSTALLATION - Step 94
  4. INSTALL AIR CLEANER INLET COVER SUB-ASSEMBLY  . Refer to INSTALLATION - Step 95
  5. INSTALL V-BANK COVER SUB-ASSEMBLY  . Refer to INSTALLATION - Step 96