Battery Control Module: Remove & Replace
WARNING: This page is about the CT 200h Base, which is a different variant/trim than selected.
HIGH VOLTAGE ELECTRICAL SYSTEM
NOTE: Labor estimates listed are for R&R only and DOES NOT include diagnosis time.| Applies To | Note | Standard Hours | Warranty Hours | Skill Level |
|---|---|---|---|---|
| Battery Smart Unit | Includes: Disable and Enable High Voltage System. | 1.9 | 1.3 | B |
| Power Management Control ECU | Includes: R&I Knee Air Bag. | 1.2 | B |