Installation [09/2014 - 10/2015]: Procedure
- INSTALL NO. 2 ECM BRACKET
- Install the No. 2 ECM bracket with the 2 screws.
Torque: 3.0 N*m (31 kgf*cm, 27 in.*lbf)
- Install the No. 2 ECM bracket with the 2 screws.
- INSTALL ECM BRACKET
- Install the ECM bracket with the 2 screws.
Torque: 3.0 N*m (31 kgf*cm, 27 in.*lbf)
- Install the ECM bracket with the 2 screws.
- INSTALL ECM
- Install the ECM with the 2 nuts.
Torque: 5.5 N*m (56 kgf*cm, 49 in.*lbf)
NOTE:- Install the ECM to the ECM box with the name plate facing the outside of the vehicle.
- Make sure that there is no foreign matter on the gasket surface of the ECM box.
- Insert the stud bolt on the vehicle rear side to the ECM first.
- Make sure that stud bolts are securely installed into the front and rear bolt holes.
- Install the ECM with the 2 nuts.
- CONNECT WIRE HARNESS
- Connect the 6 ECM connectors.NOTE:
Be sure to securely connect the connector.
- Connect the connector holder to the ECM box.
- Connect the junction connector to the connector holder.
- Connect the 2 connectors.
- Connect the 6 ECM connectors.
- INSTALL ECM COVER
- Install the ECM cover with the 3 bolts.
Torque: 5.5 N*m (56 kgf*cm, 49 in.*lbf)
NOTE:Make sure that the wire harness does not get caught between the parts.
- Install the ECM cover with the 3 bolts.
- INSTALL COOL AIR INTAKE DUCT SEAL
Refer to PROCEDURE - Step 120
- INSTALL ENGINE ROOM SIDE COVER
Refer to PROCEDURE - Step 121
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL NOTE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Refer to INITIALIZATION [09/2014 - 10/2015] ).
- PERFORM INITIALIZATION
(Refer to INITIALIZATION [09/2014 - 10/2015] )