Installation [08/2015 - ]: Procedure
- INSTALL NO. 2 ECM BRACKET
- Install the No. 2 ECM bracket to the ECM with the 2 screws.
Torque: 4.5 N.m (46 kgf/cm, 40 in.lbf)
- Install the No. 2 ECM bracket to the ECM with the 2 screws.
- INSTALL NO. 1 ECM BRACKET
- Install the No. 1 ECM bracket to the ECM with the 2 screws.
Torque: 4.5 N.m (46 kgf/cm, 40 in.lbf)
- Install the No. 1 ECM bracket to the ECM with the 2 screws.
- INSTALL ECM
- Install the ECM with the 2 nuts.
Torque: 5.5 N.m (56 kgf/cm, 49 in.lbf)
NOTE:If the ECM has been struck or dropped, replace it.
- Connect the 2 ECM connectors and lower the 2 levers.NOTE:
- When connecting the ECM connectors, make sure that the connecting parts of the ECM connectors are free of dirt, water or other foreign matter.
- Be sure to securely connect the ECM connectors.
- Install the ECM with the 2 nuts.
- INSTALL ENGINE ROOM ECU COVER
- Install the engine room ECU cover with the 3 bolts.
Torque: 5.5 N.m (56 kgf/cm, 49 in.lbf)
NOTE:Make sure that the wire harness does not get caught between the parts.
- Install the engine room ECU cover with the 3 bolts.
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL NOTE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected.
Refer to INITIALIZATION [08/2015 - 10/2016] , or refer to INITIALIZATION [10/2016 - 10/2017] , or refer to INITIALIZATION [10/2017 - 09/2020] , or refer to INITIALIZATION [09/2020 - 11/2021] , or refer to INITIALIZATION [11/2021 - 09/2022] , or refer to INITIALIZATION [09/2022 - 10/2023] , or refer to INITIALIZATION [10/2023 - ]
- PERFORM INITIALIZATION
Refer to INITIALIZATION [08/2015 - 10/2016] , or refer to INITIALIZATION [10/2016 - 10/2017] , or refer to INITIALIZATION [10/2017 - 09/2020] , or refer to INITIALIZATION [09/2020 - 11/2021] , or refer to INITIALIZATION [11/2021 - 09/2022] , or refer to INITIALIZATION [09/2022 - 10/2023] , or refer to INITIALIZATION [10/2023 - ]