Installation [04/2013 - 10/2017]: Procedure
- INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Intake Side of Bank 2)
- Apply a light coat of engine oil to a new O-ring and install it to the camshaft timing oil control valve assembly.
- Install the camshaft timing oil control valve assembly to the cylinder head cover sub-assembly LH with the bolt.
Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf)
NOTE:- Do not allow foreign matter to contact the oil seal face of the camshaft timing oil control valve assembly (connecting surface with the cylinder head cover sub-assembly LH).
- Make sure that the O-ring is not cracked or moved out of place when installing the camshaft timing oil control valve assembly.
- Connect the camshaft timing oil control valve assembly connector.
- INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Exhaust Side of Bank 2)
- Apply a light coat of engine oil to a new O-ring and install it to the camshaft timing oil control valve assembly.
- Install the camshaft timing oil control valve assembly to the cylinder head cover sub-assembly LH with the bolt.
Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf)
NOTE:- Do not allow foreign matter to contact the oil seal face of the camshaft timing oil control valve assembly (connecting surface with the cylinder head cover sub-assembly LH).
- Make sure that the O-ring is not cracked or moved out of place when installing the camshaft timing oil control valve assembly.
- Connect the camshaft timing oil control valve assembly connector.
- Install the bracket to the cylinder head cover sub-assembly LH with the bolt.
Torque: 21 N*m (214 kgf*cm, 15 ft.*lbf)
- Connect the wire harness clamp to the bracket.
- INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Intake Side of Bank 1)
- Apply a light coat of engine oil to a new O-ring and install it to the camshaft timing oil control valve assembly.
- Install the camshaft timing oil control valve assembly to the cylinder head cover sub-assembly with the bolt.
Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf)
NOTE:- Do not allow foreign matter to contact the oil seal face of the camshaft timing oil control valve assembly (connecting surface with the cylinder head cover sub-assembly).
- Make sure that the O-ring is not cracked or moved out of place when installing the camshaft timing oil control valve assembly.
- Connect the camshaft timing oil control valve assembly connector.
- Install the V-bank cover bracket sub-assembly to the cylinder head cover sub-assembly with the bolt.
Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf)
- INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Exhaust Side of Bank 1)
- Apply a light coat of engine oil to a new O-ring and install it to the camshaft timing oil control valve assembly.
- Install the camshaft timing oil control valve assembly to the cylinder head cover sub-assembly with the bolt.
Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf)
NOTE:- Do not allow foreign matter to contact the oil seal face of the camshaft timing oil control valve assembly (connecting surface with the cylinder head cover sub-assembly).
- Make sure that the O-ring is not cracked or moved out of place when installing the camshaft timing oil control valve assembly.
- Connect the camshaft timing oil control valve assembly connector.
- INSTALL INTAKE AIR SURGE TANK ASSEMBLY
Refer to INSTALLATION [04/2013 - 10/2017]