Installation [09/2015 - ]: Procedure
- INSTALL THROTTLE BODY ASSEMBLY
- Install a new gasket to the intake manifold.
HINT:
Align the protrusion of the gasket with the groove on the intake manifold.
- Connect the No. 4 and No. 5 water by-pass hoses to the throttle body assembly.NOTE:
- Position the claws of the clamps as shown in the illustration.
- Install the clamps so that they are within the hose's paint marks.
- Install the throttle body assembly with the 4 bolts.
Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf)
HINT:
Perform "Inspection After Repairs" after replacing the throttle body assembly (Refer to INITIALIZATION [09/2015 - ] ).
- Connect the throttle motor connector.
- Install a new gasket to the intake manifold.
- INSTALL INTAKE AIR CONNECTOR PIPE
Refer to PROCEDURE - Step 13
- INSTALL NO. 1 AIR CLEANER INLET
- ADD ENGINE COOLANT
Refer to PROCEDURE - Step 8
- INSPECT FOR ENGINE COOLANT LEAK
Refer to PROCEDURE - Step 1
- PERFORM INITIALIZATION NOTE:
Perform the following procedure after replacing the ECM, throttle body assembly or any throttle body components. The following procedure should also be performed if the throttle body is cleaned.
- Turn the engine switch on (IG) without operating the accelerator pedal.NOTE:
If the accelerator pedal is operated, perform the above steps again.
- Connect the Techstream to the DLC3 and clear the DTCs (Refer to DTC CHECK / CLEAR [09/2015 - ] ).
- Perform the "Inspection After Repairs" (Refer to INITIALIZATION [09/2015 - ] ).
- Start the engine and check that the MIL is not illuminated. After the engine is warmed up, check that the idle speed is within the specified range when the A/C is switched off.
Standard
Condition Engine Idle Speed A/C switched off 700 to 800 rpm NOTE:- Be sure to perform this step with all accessories off.
- Make sure that the shift lever is in neutral.
- Enter the following menus: Powertrain / Engine / Data List / All Data / Throttle Sensor Position. Sensor Output. Fully depress the accelerator pedal and check that the value is 60% or more.
- Perform a road test and confirm that there are no abnormalities.
- Turn the engine switch on (IG) without operating the accelerator pedal.
- INSTALL AIR CLEANER INLET COVER SUB-ASSEMBLY
- INSTALL V-BANK COVER SUB-ASSEMBLY
- Slide the cover from the vehicle front toward the rear of the vehicle to attach the 2 clips labeled A, and then attach the 4 clips labeled B to install the V-bank cover sub-assembly.NOTE:
- Make sure the clips are attached securely.
- Attaching the clips forcefully or hitting the top of the clips may damage them.
- When attaching the clips labeled A, be sure to slide the cover from the front of the vehicle toward the rear of the vehicle.
- Slide the cover from the vehicle front toward the rear of the vehicle to attach the 2 clips labeled A, and then attach the 4 clips labeled B to install the V-bank cover sub-assembly.
- INSTALL NO. 1 ENGINE UNDER COVER
Refer to PROCEDURE - Step 13
- INSTALL FRONT WHEEL OPENING EXTENSION PAD LH (for AWD)
Refer to PROCEDURE - Step 15
- INSTALL FRONT WHEEL OPENING EXTENSION PAD RH (for AWD)
Refer to PROCEDURE - Step 16