Installation [09/2014 - ]: Procedure
- INSTALL SEMICONDUCTOR POWER INTEGRATION ECU
- INSTALL NO. 2 RELAY BLOCK COVER
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL NOTE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected.
Refer to INITIALIZATION [09/2014 - 10/2015] , or refer to INITIALIZATION [10/2015 - 11/2017] , or refer to INITIALIZATION [11/2017 - 10/2018] , or refer to INITIALIZATION [10/2018 - 09/2020] , or refer to INITIALIZATION [09/2020 - 10/2022] , or refer to INITIALIZATION [10/2022 - 10/2023] , or refer to INITIALIZATION [10/2023 - ]