Installation [09/2014 - ]: Procedure
- INSTALL SPARK PLUG
- Install the 6 spark plugs.
Torque: 18 N*m (184 kgf*cm, 13 ft.*lbf)
NOTE:If a component has been dropped or subjected to a strong impact, replace it.
HINT:
Perform "Inspection After Repairs" after replacing the spark plug (See article. Refer to INITIALIZATION [09/2014 - ] ).
- Install the 6 spark plugs.
- INSTALL IGNITION COIL ASSEMBLY
HINT:
Perform "Inspection After Repairs" after replacing the ignition coil (See article. Refer to INITIALIZATION [09/2014 - ] ).
- for Bank 1:
- Install the 3 ignition coils with the 3 bolts.
Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf)
HINT:
Perform "Inspection After Repairs" after replacing the ignition coil (See article. Refer to INITIALIZATION [09/2014 - ] ).
- Connect the VVT sensor connector and 3 ignition coil connectors to connect the engine wire.
- Connect the clamp and install the 2 nuts.
Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf)
- Install the 3 ignition coils with the 3 bolts.
- for Bank 2:
- Install the 3 ignition coils with the 3 bolts.
Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf)
HINT:
Perform "Inspection After Repairs" after replacing the ignition coil (See article. Refer to INITIALIZATION [09/2014 - ] ).
- Connect the manifold absolute pressure sensor connector, VVT sensor connector and 3 ignition coil connectors to connect the engine wire.
- Connect the 2 clamps and install the 3 nuts.
Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf)
- Install the 3 ignition coils with the 3 bolts.
- Connect the inverter reservoir tank assembly with the 2 bolts.
Torque: 13 N*m (133 kgf*cm, 10 ft.*lbf)
- for Bank 1:
- INSTALL AIR CLEANER CAP WITH AIR CLEANER HOSE
See step 2
- INSTALL NO. 2 VENTILATION HOSE
See step 3
- INSTALL COOL AIR INTAKE DUCT SEAL
Refer to PROCEDURE - Step 117 Refer to PROCEDURE - Step 116
- INSTALL ENGINE ROOM SIDE COVER
Refer to PROCEDURE - Step 118 Refer to PROCEDURE - Step 117
- INSTALL V-BANK COVER SUB-ASSEMBLY
Refer to PROCEDURE - Step 116 Refer to PROCEDURE - Step 115