LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Lexus >> 2017 >> IS 200t Base >> Repair and Diagnosis >> Engine Performance >> Engine Control Systems >> Engine Control System (8AR-FTS) - Service Information >> Camshaft Oil Control Solenoid >> Installation [08/2015 - ] >> Procedure
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Installation [08/2015 - ]: Procedure

  1. INSTALL CAMSHAFT TIMING OIL CONTROL SOLENOID ASSEMBLY 
    1. Apply engine oil to a new O-ring and install it to the camshaft timing oil control solenoid assembly as shown in the illustration.
      GTY613349Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      *1 O-ring
      NOTE:

      Do not damage the O-ring.

    2. Apply adhesive to 2 or 3 threads of 2 new bolts.
      GTY631072Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      *a Adhesive

      Adhesive

      Toyota Genuine Adhesive 1324, Three Bond 1324 or equivalent

    3. Install the camshaft timing oil control solenoid assembly to the timing chain cover sub-assembly with the 2 bolts.

      Torque: 10 N.m (102 kgf/cm, 7 ft.lbf) 

      NOTE:
      • If the camshaft timing oil control solenoid assembly has been struck or dropped, replace it.
      • Make sure that the O-ring is not cracked or moved out of place when installing the camshaft timing oil control solenoid assembly.
    4. Connect the camshaft timing oil control solenoid assembly connector.
  2. INSTALL AIR CLEANER HOSE ASSEMBLY 

    Refer to PROCEDURE - Step 3

  3. INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 81 [08/2015 - 10/2016] , or refer to PROCEDURE - Step 80 [10/2016 - 09/2020] , or refer to PROCEDURE - Step 80 [09/2020 - ]

  4. INSPECT FOR ENGINE OIL LEAK 

    Refer to PROCEDURE - Step 5 [08/2015 - 09/2020] , or refer to PROCEDURE - Step 5 [09/2020 - 11/2021] , or refer to PROCEDURE - Step 5 [11/2021 - 09/2022] , or refer to PROCEDURE - Step 5 [09/2022 - ]