Installation [04/2013 - ]: Procedure
- INSTALL SKID CONTROL BUZZER ASSEMBLY
- Engage the clamp to install the skid control buzzer assembly.
- Connect the connector.
- INSTALL LOWER INSTRUMENT PANEL FINISH PANEL SUB-ASSEMBLY
Refer to PROCEDURE - Step 34 [04/2013 - 10/2016] , or refer to PROCEDURE - Step 35 [10/2016 - 10/2017] , or refer to PROCEDURE - Step 35 [10/2017 - 09/2020] , or refer to PROCEDURE - Step 33 [09/2020 - ]
- CONNECT HOOD LOCK CONTROL LEVER SUB-ASSEMBLY
Refer to PROCEDURE - Step 35 [04/2013 - 10/2016] , or refer to PROCEDURE - Step 36 [10/2016 - 10/2017] , or refer to PROCEDURE - Step 36 [10/2017 - 09/2020] , or refer to PROCEDURE - Step 34 [09/2020 - ]
- INSTALL NO. 1 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY
Refer to PROCEDURE - Step 36 [04/2013 - 10/2016] , or refer to PROCEDURE - Step 37 [10/2016 - 10/2017] , or refer to PROCEDURE - Step 37 [10/2017 - 09/2020] , or refer to PROCEDURE - Step 35 [09/2020 - ]