Installation [08/2015 - ]: Procedure
- INSTALL SPARK PLUG
HINT:
Perform "Inspection After Repairs" after replacing the spark plug (Refer to INITIALIZATION [08/2015 - ] ).
- Using a 16 mm plug wrench, install the 8 spark plugs.
Torque: 21 N*m (214 kgf*cm, 15 ft.*lbf)
- Using a 16 mm plug wrench, install the 8 spark plugs.
- INSTALL IGNITION COIL ASSEMBLY
HINT:
Perform "Inspection After Repairs" after replacing the ignition coil assembly (Refer to INITIALIZATION [08/2015 - ] ).
- for Bank 1:
Install the 4 ignition coils.
- Install the 4 ignition coils with the 4 bolts.
Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf)
- Connect the 4 ignition coil connectors.
- Attach the clamp and connect the engine wire.
- Install the 4 ignition coils with the 4 bolts.
- for Bank 2:
Install the 4 ignition coils.
- Install the 4 ignition coils with the 4 bolts.
Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf)
- Connect the 4 ignition coil connectors.
- Attach the 2 clamps and connect the engine wire.
- Connect the No. 4 water by-pass pipe with the 2 bolts.
Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf)
- Attach the clamp and connect the engine wire.
- Install the 4 ignition coils with the 4 bolts.
- for Bank 1:
- INSTALL AIR CLEANER CASE SUB-ASSEMBLY
Refer to PROCEDURE - Step 51 [08/2015 - 08/2020] , or refer to PROCEDURE - Step 51 [08/2020 - ]
- INSTALL AIR CLEANER FILTER ELEMENT SUB-ASSEMBLY
- INSTALL AIR CLEANER CAP AND HOSE
Refer to PROCEDURE - Step 53 [08/2015 - 08/2020] , or refer to PROCEDURE - Step 53 [08/2020 - ]
- INSTALL V-BANK COVER SUB-ASSEMBLY
Refer to PROCEDURE - Step 80 [08/2015 - 08/2020] , or refer to PROCEDURE - Step 80 [08/2020 - ]