Installation [10/2015 - ]: Procedure
- INSTALL YAW RATE SENSOR BRACKET
- Engage the 2 hooks to install the yaw rate sensor bracket with the 2 screws.
Torque: 12.5 N*m (127 kgf*cm, 9 ft.*lbf)
- Engage the 2 hooks to install the yaw rate sensor bracket with the 2 screws.
- INSTALL ROLL RATE AND VERTICAL ACCELERATION SENSOR (YAW RATE SENSOR)
- Install the roll rate and vertical acceleration sensor (yaw rate sensor) with the 2 nuts.
Torque: 9.0 N*m (92 kgf*cm, 80 in.*lbf)
NOTE:- Do not drop the roll rate and vertical acceleration sensor (yaw rate sensor).
- If the roll rate and vertical acceleration sensor (yaw rate sensor) is dropped, replace it with a new one.
- Connect the connector to the roll rate and vertical acceleration sensor (yaw rate sensor).NOTE:
Make sure that the roll rate and vertical acceleration sensor (yaw rate sensor) connector is connected securely.
- Install the roll rate and vertical acceleration sensor (yaw rate sensor) with the 2 nuts.
- INSTALL INSTRUMENT CLUSTER FINISH PANEL ASSEMBLY
Refer to INSTALLATION [10/2015 - ]
- INSTALL CONSOLE BOX ASSEMBLY
Refer to INSTALLATION [10/2015 - ]
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Refer to PROCEDURE - Step 2
NOTE:When disconnecting the cable, some systems need to be initialized after the cable is reconnected.
Refer to INITIALIZATION [10/2015 - 09/2016] , or Refer to INITIALIZATION [09/2016 - 09/2017] , or Refer to INITIALIZATION [09/2017 - ]
- PERFORM YAW RATE AND ACCELERATION SENSOR AND ROLL RATE AND VERTICAL ACCELERATION SENSOR ZERO POINT CALIBRATION
Refer to CALIBRATION [10/2015 - 09/2017] , or Refer to CALIBRATION [09/2017 - ]