Installation [08/2015 - ]: Procedure
- INSTALL NO. 2 HEIGHT CONTROL VALVE SUB-ASSEMBLY
- Install the No. 2 height control valve with the 2 bolts.
Torque: 29 N*m (296 kgf*cm, 21 ft.*lbf)
- Install the No. 2 height control valve with the 2 bolts.
- CONNECT HEIGHT CONTROL TUBE
- Connect the 3 height control tubes (Refer to PRECAUTION [08/2015 - ]
).
HINT:
For the connection procedure of the tubes (type 1 and type 2), refer to Precaution of the Suspension Control System section.
- Connect the connector.
- Connect the 3 height control tubes (Refer to PRECAUTION [08/2015 - ]
).
- INSTALL FUEL PUMP CONTROL ECU ASSEMBLY
Refer to PROCEDURE - Step 1
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL NOTE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Refer to INITIALIZATION [08/2015 - 08/2019] , or refer to INITIALIZATION [08/2019 - 08/2021] , or refer to INITIALIZATION [08/2021 - 08/2022] , or refer to INITIALIZATION [08/2022 - ] ).
- CHECK CONNECTION OF TUBE FOR AIR LEAK
- Check the connections of the tubes for air leakage (Refer to PRECAUTION [08/2015 - ] ).