LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Lexus >> 2020 >> RC F Base >> Repair and Diagnosis >> Transmission >> Transmission Control Systems >> Automatic Transmission System - Service Information >> Kick-Down Switch >> Installation [09/2014 - ] >> Procedure
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Installation [09/2014 - ]: Procedure

  1. INSTALL KICK DOWN SWITCH ASSEMBLY 
    1. Install the kick down switch assembly to the vehicle body with the nut and 2 bolts.

      Torque: 5.5 N.m (56 kgf/cm, 49 in.lbf) 

    2. Engage the clamp.
    3. Connect the kick down switch assembly connector.
  2. INSTALL NO. 3 DASH PANEL INSULATOR PAD 
    1. Install the No. 3 dash panel insulator pad with the 2 clips.
    2. Return the front floor carpet assembly to its original position as shown in the illustration and engage each fastener.
      GTY510569Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      *a Clamp *b Guide
      Fastener - -
    3. Engage the guide.
    4. Engage the clamp.
    5. Install the clip.
  3. INSTALL ACCELERATOR PEDAL ASSEMBLY 

    Refer to INSTALLATION [09/2014 - ]

  4. INSTALL FRONT DOOR OPENING TRIM COVER LH 

    Refer to PROCEDURE - Step 37 [09/2014 - 11/2017] , or refer to PROCEDURE - Step 36 [11/2017 - ]

  5. INSTALL FRONT DOOR SCUFF PLATE LH 

    Refer to PROCEDURE - Step 38 [09/2014 - 11/2017] , or refer to PROCEDURE - Step 37 [11/2017 - ]

  6. INSTALL FRONT NO. 1 CONSOLE BOX INSERT 

    Refer to PROCEDURE - Step 7 [09/2014 - 03/2019] , or refer to PROCEDURE - Step 7 [03/2019 - ]

  7. INSTALL INSTRUMENT PANEL FINISH PANEL END LH 

    Refer to PROCEDURE - Step 11 [09/2014 - 03/2019] , or refer to PROCEDURE - Step 11 [03/2019 - ]