Installation [08/2015 - 08/2021]: Procedure
- INSTALL COMBINATION SWITCH ASSEMBLY (CRAWL CONTROL SWITCH)
- Install the combination switch (crawl control switch) with the 4 screws.
- INSTALL UPPER CONSOLE PANEL SUB-ASSEMBLY
Refer to PROCEDURE - Step 5 [08/2015 - 08/2019] , or refer to PROCEDURE - Step 5 [08/2019 - 08/2021]
- INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY
Refer to PROCEDURE - Step 6 [08/2015 - 08/2019] , or refer to PROCEDURE - Step 6 [08/2019 - 08/2021]
- INSTALL INSTRUMENT PANEL FINISH PANEL END LH
Refer to PROCEDURE - Step 7 [08/2015 - 08/2019] , or refer to PROCEDURE - Step 7 [08/2019 - 08/2021]
- INSTALL INSTRUMENT PANEL FINISH PANEL END RH
Refer to PROCEDURE - Step 8 [08/2015 - 08/2019] , or refer to PROCEDURE - Step 8 [08/2019 - 08/2021]
- PERFORM CRAWL CONTROL CALIBRATION
- Perform crawl control calibration (Refer to CALIBRATION [08/2015 - 08/2019] , or refer to CALIBRATION [08/2019 - 08/2021] ).