Installation [08/2015 - ]: Procedure
- INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Exhaust Side of Bank 1)
- Apply a light coat of engine oil to a new O-ring.
- Install the O-ring to the camshaft timing oil control valve.
- Install the camshaft timing oil control valve with the bolt.
Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf)
- Connect the camshaft timing oil control valve connector.
- INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Intake Side of Bank 1)
- Apply a light coat of engine oil to a new O-ring.
- Install the O-ring to the camshaft timing oil control valve.
- Install the camshaft timing oil control valve with the bolt.
Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf)
- Connect the camshaft timing oil control valve connector.
- INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Intake Side of Bank 2)
- Apply a light coat of engine oil to a new O-ring.
- Install the O-ring to the camshaft timing oil control valve.
- Install the camshaft timing oil control valve with the bolt.
Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf)
- Connect the camshaft timing oil control valve connector.
- INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Exhaust Side of Bank 2)
- Apply a light coat of engine oil to a new O-ring.
- Install the O-ring to the camshaft timing oil control valve.
- Install the camshaft timing oil control valve with the bolt.
Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf)
- Connect the camshaft timing oil control valve connector.
- INSTALL AIR CLEANER CAP AND HOSE
Refer to PROCEDURE - Step 53 [08/2015 - 08/2020] , or refer to PROCEDURE - Step 53 [08/2020 - ]
- INSTALL V-BANK COVER SUB-ASSEMBLY
Refer to PROCEDURE - Step 80 [08/2015 - 08/2020] , or refer to PROCEDURE - Step 80 [08/2020 - ]