Installation [01/2017 - ]: Procedure
- INSTALL SPARK PLUG
HINT:
Perform "Inspection After Repair" after replacing a spark plug.
Refer to INITIALIZATION [01/2017 - 09/2018] , or refer to INITIALIZATION [09/2018 - 04/2020] , or refer to INITIALIZATION [04/2020 - ]
- Install the 6 spark plugs to the cylinder head sub-assembly.
Torque: 18 N.m (184 kgf/cm, 13 ft.lbf)
NOTE:If a spark plug has been struck or dropped, replace it.
- Install the 6 spark plugs to the cylinder head sub-assembly.
- INSTALL IGNITION COIL ASSEMBLY
Refer to PROCEDURE - Step 2
- INSTALL AIR CLEANER WITH AIR CLEANER HOSE
Refer to PROCEDURE - Step 4
- CONNECT NO. 2 PCV HOSE
Refer to PROCEDURE - Step 6
- INSTALL RADIATOR SUPPORT TO CROSS MEMBER BRACE SUB-ASSEMBLY RH
Refer to PROCEDURE - Step 7 [01/2017 - 06/2019] , or refer to PROCEDURE - Step 7 [06/2019 - 05/2023] , or refer to PROCEDURE - Step 7 [05/2023 - ]
- INSTALL LOWER RADIATOR AIR DEFLECTOR
Refer to PROCEDURE - Step 28
- INSTALL RADIATOR SUPPORT TO FRAME SEAL RH
Refer to PROCEDURE - Step 29
- INSTALL V-BANK COVER SUB-ASSEMBLY
Refer to PROCEDURE - Step 118 [01/2017 - 06/2019] , or refer to PROCEDURE - Step 118 [06/2019 - 05/2023] , or refer to PROCEDURE - Step 118 [05/2023 - ]