LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Lexus >> 2021 >> LS 500 Base, AWD >> Repair and Diagnosis >> Engine Performance >> Engine Control Systems >> Engine Control System - Service Information >> CAMSHAFT OIL CONTROL VALVE (for Bank 2) >> Removal [12/2017 - 10/2020] >> Procedure
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Removal [12/2017 - 10/2020]: Procedure

  1. REMOVE CAM TIMING OIL CONTROL SOLENOID ASSEMBLY LH 

    Refer to REMOVAL [12/2017 - 10/2020] 

  2. REMOVE CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (EXHAUST CAMSHAFT TIMING GEAR BOLT ASSEMBLY) 
    1. Using a 5 mm hexagon socket wrench, remove the bolt.
      NOTE:

      Do not remove the other 2 bolts.

      HINT: 

      If it is difficult to loosen the bolt due to the tools contacting the vehicle body or other parts, rotate the crankshaft to move the bolt to a position where it can be removed easily.

      GTY822659Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      *1 Camshaft Timing Oil Control Valve Assembly (Exhaust Camshaft Timing Gear Bolt Assembly)
      *a Bolt
    2. Remove the camshaft timing oil control valve assembly (exhaust camshaft timing gear bolt assembly) from the camshaft timing exhaust gear assembly.