Caution / Notice / Hint
The necessary procedures (adjustment, calibration, initialization, or registration) that must be performed after parts are removed and installed, or replaced during mass air flow meter sub-assembly removal/installation are shown below.
NECESSARY PROCEDURES AFTER PARTS REMOVED/INSTALLED/REPLACED
| Replaced Part or Performed Procedure | Necessary Procedure | Effect/Inoperative Function when Necessary Procedure not Performed | Link |
|---|---|---|---|
| Mass air flow meter sub-assembly | Inspection after repair |
|
Refer to INITIALIZATION [12/2017 - 10/2020] , or refer to INITIALIZATION [10/2020 - 10/2023] , or refer to INITIALIZATION [10/2023 - ] |