Installation [10/2023 - ]: Procedure
- INSTALL INTEGRATION CONTROL SUPPLY
- INSTALL NO. 2 INTEGRATION CONTROL SUPPLY BRACKET
- INSTALL NO. 1 INTEGRATION CONTROL SUPPLY BRACKET
- INSTALL INTEGRATION CONTROL SUPPLY WITH BRACKET
- Attach the guide and temporarily install the integration control supply with bracket as shown in the illustration.
Install in this Direction - Tighten the bolt and nut to install the integration control supply with bracket.
Nut
Torque: 8.0 N.m (82 kgf/cm, 71 in.lbf)
Bolt
Torque: 10 N.m (102 kgf/cm, 7 ft.lbf)
Connector Nut Bolt - Connect the connector.
- Attach the guide and temporarily install the integration control supply with bracket as shown in the illustration.
- INSTALL BLE INDOOR DIGITAL KEY RECEIVER ASSEMBLY
Refer to INSTALLATION [10/2023 - ]
- CONNECT CABLE TO NEGATIVE AUXILIARY BATTERY TERMINAL
Refer to PROCEDURE - Step 2
- INSTALL LUGGAGE COMPARTMENT MAT SUB-ASSEMBLY
Refer to PROCEDURE - Step 13
- INITIALIZATION AFTER RECONNECTING BATTERY TERMINAL
Refer to WORK PROCEDURE [10/2022 - ]
HINT:
When disconnecting and reconnecting the battery, there is an automatic learning function that completes learning when the respective system is used.